Every system across the office park captured, coordinated, and handed over fit-out ready

A 1.2 M sq ft Grade-A LEED Platinum office park where Observance delivered an as-built BIM model that consolidated RCC, MEP, HVAC, firefighting, and allied services for tenant fit-out from day one.

Powered by Observance
Grade-A office park exterior with LEED-certified façade

1.2 M sq ft

Coverage across the office park

Day-1

Fit-out ready model

Re-surveys

Eliminated for tenants

Project Brief

Type

Grade-A Commercial Office Park

(LEED Platinum Certified)

Scale

1.2 M Sq Ft

Cost

Premium office park

The brief

A 1.2 M sq ft Grade-A office park, LEED Platinum certified, in active leasing while interior execution ran in parallel. The owner needed a high-accuracy as-built BIM that tenant design teams could pick up directly — not a sanitised marketing model.

Why it was risky

Multi-tenant office parks fail at the seam between base-build and tenant fit-out. If the as-built model isn't accurate, every tenant's design team re-surveys their floor before they can begin — adding weeks to onboarding and creating coordination conflicts later.

  • As-built accuracy was the precondition for any usable handover; any drift would push it back to a re-survey programme.
  • Systems consolidation across RCC, MEP, HVAC, firefighting and allied services into one environment was missing.
  • Fit-out readiness required the model to meet tenant-design-team standards, not just owner-side documentation.
  • Timeline pressure came from leasing — tenants were waiting on the model.

What Observance did

  • Scan-to-BIM delivery captured the structural and service systems across the full building.
  • Systems integration consolidated RCC, MEP, HVAC, firefighting and allied services into one coordinated BIM environment.
  • Automated QC workflows kept the cycle short enough to meet the leasing schedule.
  • Fit-out ready model met the standard tenant design teams could use from day one.

Outcome

Tenant onboarding accelerated, re-surveys were eliminated, base-build coordination improved, and the office park reached occupancy readiness on the leasing-driven schedule.

Impact

Tenants

Onboarding accelerated against the as-built

Re-surveys

Eliminated across the leasing programme

Base-build

Coordination improved between trades